ST. JOSEPH COUNTY/
CITY OF SOUTH BEND
BUILDING DEPARTMENT
PERMIT FEE
SCHEDULE 2026
JURISDICTION
The St. Joseph County/South Bend Building Department jurisdiction includes the City of South
Bend, the unincorporated areas of St. Joseph County (including Wyatt, Granger, Terre Coupe, and
Crumstown).
As a general rule, if the address has 5 digits, it falls within the unincorporated area of St. Joseph
County. If the address is 3-4 digits and has a South Bend mailing, it falls within the City of South
Bend.
The following cities have turned their inspection requirements over to our Department; however,
the town must approve all work and issue an Improvement Location Permit prior to our
Department issuing any permits. These towns regulate and enforce their own zoning requirements.
Our Department only has jurisdiction over building, electrical, plumbing, and HVAC codes in their
territories.
Indian Village
Lakeville
North Liberty
Osceola
Roseland
Addresses with 3-4 digits with any of those towns’ mailing will fall within those town limits.
The following cities and towns have their own Departments and you will need to contact their
offices to obtain any zoning or building information.
Mishawaka
New Carlisle
Walkerton
Addresses with 3-4 digits with these towns’ mailing, will fall within their jurisdiction.
PERMIT FEES - GENERAL
PERMIT FEES APPLY TO ALL NEW CONSTRUCTION AND ALL
ALTERATIONS, REPAIRS, AND REMODELING.
NO PERSON, COMPANY, OR CORPORATION SHALL PERFORM OR CAUSE
TO BE PERFORMED ANY WORK ON OR IN THE UNINCORPORATED
AREAS OF ST. JOSEPH COUNTY, CITY OF SOUTH BEND, TOWNS OF
LAKEVILLE, NORTH LIBERTY, OSCEOLA, AND ROSELAND, AND INDIAN
VILLAGE WITHOUT OBTAINING IN ADVANCE A PERMIT FROM THE
BUILDING DEPARTMENT.
WHERE A PERSON SHALL UNLAWFULLY PROCEED TO DO ANY WORK
OR · CONSTRUCTION WITHOUT A REQUIRED PERMIT, THE PERMIT FEES
SHALL BE TRIPLED AS A PENALTY. THE PAYMENT OF SUCH PENALTY
SHALL NOT RELEASE THE PERSON IN DEFAULT FROM ANY OTHER
PENALTIES HEREAFTER PROVIDED.
BUILDING PERMIT FEES:
New Construction and Additions:
The fee for permits issued for residential and commercial new construction
and building additions shall be based upon the following:
a. Cost per Square Foot (CSF) times the Total Square Footage (TSF)
times the Local Variable Factor (LVF) of $.00098.
b. Cost per Square Foot (CSF) shall be determined by the International
Code Council Building Valuation Table in effect in January of each
year.
c. The cost per square foot (CSF) by occupancy classifications shall be
amended as follows:
1. Groups F-1, F-2, H-1, H-2, H-3, H-4, and M shall have the same
rate As A-3.
2. Groups I-4, R-2, and R-4 shall have the same rate as I-1.
3. Groups S-1, S-2, and U shall have the same rate as R-3.
d. Minimum Fee - $60.00
Remodeling, Alterations, and Repairs over $500.00, fence installations, in-
ground pool Installation, communication towers, and utilities:
Estimated Construction Costs Permit Fees
$1.00
to 3,000.00......................................................................................................
3,001.00 to
4,000.00. ...............................................................................................
4,001.00to
5,000.00.................................................................................................
5,001.00
to
6,000.00..................................................................................................
6,001.00 to 7,000.00.......................................................................................................
7,001.00 to 8,000.00 .....................................................................................................
8,001.00 to 9,000.00 ....................................................................................................
9,001.00 to 10,000.00....................................................................................................
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
Estimated Construction Costs Permit Fees
10,001.00 to 11,000.00...............................................................................................
11,001.00 to 12,000.00..............................................................................................
12,001.00 to 13,000.00........ ......................................................................................
13,001.00 to 14,000.00....................................................................................................
14,001.00 to 15,000.00...................................................................................................
15,001.00to
16,000.00...............................................................................................
16,001.00 to 17,000.00...................................................................................................
17,001.00to
18,000.00...............................................................................................
18,001.00to
19,000.00...............................................................................................
19,001.00to
20,000.00..............................................................................................
20,001.00
to
21,000.00...............................................................................................
21,001.00 to 22,000.00..............................................................................................
22,001.00 to 23,000.00................................................................. .............................
23,001.00 to 24,000.00...............................................................................................
24,001.00 to 25,000.00..................................................................................................
25,001.00 to 26,000.00...............................................................................................
26,001.00 to
27,000.00...............................................................................................
27,001.00 to 28,000.00...............................................................................................
28,001.00 to 29,000.00...............................................................................................
29,001.00 to 30,000.00...............................................................................................
30,001.00 to 31,000.00..............................................................................................
31,001.00 to
32,000.00 ...............................................................................................
32,001.00 to 33,000.00…...................................... .........................................................
33,001.00 to 34,000.00...............................................................................................
34,001.00 to
35,000.00................................................................................................
35,001.00 to 36,000.00...............................................................................................
36,001.00 to 37,000.00..............................................................................................
37,001.00 to 38,000.00..............................................................................................
38,001.00 to 39,000.00...............................................................................................
39,001.00 to 40,000.00...............................................................................................
40,001.00 to 41,000.00...............................................................................................
41,001.00 to 42,000.00..............................................................................................
42,001.00 to 43,000.00...............................................................................................
43,001.00 to 44,000.00...............................................................................................
44,001.00 to 45,000.00 ...................................................................................................
45,001.00 to 46,000.00...............................................................................................
46,001.00
to 47,000.00 ...............................................................................................
47,001.00 to 48,000.00...............................................................................................
48,001.00 to 49,000.00 ..................................................................................................
49,001.00 to 50,000.00 ..................................................................................................
50,001.00 to 51,000.00 ....................................................................................................
51,001.00 to 52,000.00.....................................................................................................
52,001.00 to 53,000.00.....................................................................................................
53,001.00 to 54,000.00...............................................................................................
54,001.00
to 55,000.00...............................................................................................
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00
180.00
185.00
190.00
195.00
200.00
205.00
210.00
215.00
220.00
225.00
230.00
235.00
240.00
245.00
250.00
255.00
260.00
265.00
270.00
275.00
280.00
285.00
290.00
295.00
300.00
305.00
310.00
315.00
320.00
Estimated Construction Costs Permit Fees
55,001.00 to
56,000.00..................................................................................................
325.00
56,001.00 to 57,000.00...................................................................................................
330.00
57,001.00 to 58,000.00 ...................................................................................................
335.00
58,001.00
to 59,000.00................................................................................................
340.00
59,001.00 to 60,000.00................................................................................................
345.00
60,001.00 to 61,000.00......................................................................................................
350.00
61,001.00 to 62,000.00 .....................................................................................................
355.00
62,001.00 to 63,000.00 .....................................................................................................
360.00
63,001.00 to 64,000.00......................................................................................................
365.00
64,001.00
to 65,000.00...............................................................................................
370.00
65,001.00 to 66,000.00......................................................................................................
375.00
66,001.00 to 67,000.00................................................................................................
380.00
67,001.00to
68,000.00................................................................................................
385.00
68,001.00 to 69,000.00................................................................................................
390.00
69,001.00 to 70,000.00................................................................................................
395.00
70,001.00 to 71,000.00................................................................................................
400.00
71,001.00 to 72,000.00................................................................................................
405.00
72,001.00 to 73,00.0.00.......................................................................................................
410.00
73,001.00 to 74,000.00..................................................................................................
415.00
74,001.00to
75,000.00................................................................................................
420.00
75,001.00 to 76,000.00................................................................................................
425.00
76,001.00to77,000.00.............................................................................................
430.00
77,001.00 to 78,000.00 ...................................................................................................
435.00
78,001.00 to 79,000.00 .....................................................................................................
·
440.00
79,001.00
to 80,000.00................................................................................................
445.00
80,001.00 to 81,000.00.................................. .............................................................
450.00
81,001.00 to 82,000.00.....................................................................................................
455.00
82,001.00 to 83,000.00 ....................................................................................................
460.00
83,001.00 to 84,000.00.....................................................................................................
465.00
84,001.00to
85,000.00................................................................................................
470.00
85,001.00 to 86,000.00.....................................................................................................
475.00
86,001.00 to 87,000.00.....................................................................................................
480.00
87,001.00to 88,000.00............................................................................................
485.00
88,001.00 to 89,000.00...............................................................................................
490.00
89,001.00 to 90,000.00 ...................................................................................................
495.00
90,001.00 to 91,000.00 .....................................................................................................
500.00
91,001.00 to 92,000.00 .....................................................................................................
505.00
92,001.00 to 93,000.00 .....................................................................................................
510.00
93,001.00 to 94,000.00 .....................................................................................................
515.00
94,001.00 to 95,000.00.....................................................................................................
520.00
95,001.00 to 96,000.00.....................................................................................................
525.00
96,001.00 to 97,000.00.....................................................................................................
530.00
97,001.00 to 98,000.00 .....................................................................................................
535.00
98,001.00 to 99,000.00 ....................................................................................................
540.00
99,001.00 to 100,000.00...................................................................................................
545.00
100,000andup..............................................................................................................
550.00*
*
PLUS per thousand dollars ($1000.00) of estimated
construction cost thereafter, up to $1,000,000.00
total estimated
construction cost........................................................................... $0.90
*
PLUS per one thousand dollars ($1000.00) of estimated construction
cost thereafter........................................................................... $0.60
Each reinspection for commercial and industrial projects .................................... $60.00
Each additional final inspection necessitated by the failure to
pass previous final inspection .................................................................. $80.00
CITY PROJECTS ONLY
FIRE DEPARTMENT
COMMERCIAL PLAN REVIEW FEE:
a. Sprinkled Building $348.00
b. Non-sprinkled Building $205.00
c. Addition $253.00
d. Remodel - under $58,001 as follows:
1.00 to 1,000..00
....................................................................................................................
45.00
1,001.00 to 2,000.00
..........................................................................................................
50.00
2,001.00 to 3,000.00. ............................................................................................................ 55.00
3,001.00 to 4,000.00. ............................................................................................................ 60.00
4,001.00 to 5,000.00 ............................................................................................................. 65.00
5,001.00 to 6,000.00 ............................................................................................................. 70.00
6,001.00 to 7,000.00 .............................................................................................................. 75.00
7,001.00 to 8,000.00. ........................................................................................................... 80.00
8,001.00 to 9,000.00 ............................................................................................................. 85.00
9,001.00 to 10,000.00 ........................................................................................................... 90.00
10,001.00 to 11,000.00. ........................................................................................................ 95.00
11,001.00 to 12,000.00 ......................................................................................................... 100.00
12,001.00 to 13,000.00 ......................................................................................................... 105.00
13,001.00 to 14,000.00 ......................................................................................................... 110.00
14,001.00 to 15,000.00 ......................................................................................................... 115.00
15,001.00 to 16,000.00 ......................................................................................................... 120.00
16,001.00 to 17,000.00 ......................................................................................................... 125.00
17,001.00 to 18,000.00.......................................................................................................... 130.00
18,001.00 to 19,000.00. ......................................................................................................... 133.00
19,001.00 to 20,000.00. ......................................................................................................... 136.00
20,001.00 to 21,000.00 .......................................................................................................... 139.00
21,001.00 to 22,000.00. ........................................................................................................ 142.00
22,001.00 to 23,000.00 .......................................................................................................... 145.00
23,001.00 to 24,000.00. ........................................................................................................ 148.00
24,001.00 to 25,000.00......................................................................................................... 151.00
25,001.00 to 26,000.00. ........................................................................................................ 154.00
26,001.00 to 27,000.00. ......................................................................................................... 157.00
27,001.00 to 28,000.00. ......................................................................................................... 160.00
28,001.00 to 29,000.00 .......................................................................................................... 163.00
29,001.00 to 30,000.00 .......................................................................................................... 166.00
30,001.00 to 31,000.00......................................................................................................... 169.00
31,001.00 to 32,000.00 .......................................................................................................... 172.00
32,001.00 to 33,000.00 .......................................................................................................... 175.00
33,001.00 to 34,000.00. ......................................................................................................... 178.00
34,001.00 to 35,000.00 .......................................................................................................... 181.00
35,001.00 to 36,000.00. ......................................................................................................... 184.00
36,001.00 to 37,000.00 .......................................................................................................... 187.00
37,001.00 to 38,000.00. ......................................................................................................... 190.00
38,001.00 to 39,000.00 .......................................................................................................... 193.00
39,001.00 to 40,000.00 ......................................................................................................... 196.00
40,001.00 to 41,000.00 .......................................................................................................... 199.00
41,001.00 to 42,000.00 .......................................................................................................... 202.00
42,001.00 to 43,000.00 .......................................................................................................... 205.00
43,001.00 to 44,000.00 .......................................................................................................... 208.00
44,001.00 to 45,000.00. ........................................................................................................ 211.00
45,001.00 to 46,000.00. ......................................................................................................... 214.00
46,001.00 to 47,000.00 .......................................................................................................... 217.00
47,001.00 to 48,000.00. ......................................................................................................... 220.00
48,001.00 to 49,000.00 .......................................................................................................... 223.00
49,001.00 to 50,000.00 .......................................................................................................... 226.00
50,001.00 to 51,000.00 .......................................................................................................... 229.00
51,001.00 to 52,000.00. ......................................................................................................... 232.00
52,001.00 to 53,000.00. ......................................................................................................... 235.00
53,001.00 to 54,000.00 .......................................................................................................... 238.00
54,001.00 to 55,000.00 .......................................................................................................... 241.00
55,001.00 to 56,000.00 ......................................................................................................... 244.00
56,001.00 to 57,000 .............................................................................................................. 247.00
57,001.00 to 58,000.00 .......................................................................................................... 250.00
e. Remodeling over $58,000 $253.00
NORTHEAST NEIGHBORHOOD DEVELOPMENT AREA DESIGN REVIEW FEES:
All stand-alone residential or commercial new construction, in addition to and separate from
any other permit, processing, or review f e e .......................$160.00*
*The Department's review or processing of all of the above listed matters are subject to form and
submission requirements which are available for inspection in the office of the Building
Department, and viewable on the City website, w w w. southbendin.gov.
ELECTRICAL PERMIT FEES
Electrical permits issued and obtained prior to commencement of the work for which such permit is
required, the following fees shall be levied, with a minimum permit fee being $60.00.
Temporary Services (All amperage) .......................................................................... $ 7.00
Switchboards and Panel Boards each (new and replaced)
60 amp…………………………………………………………........... $ 7.00
100 amp…………………………………………………………………… $ 9.00
200 amp………………………………………………………………......... $12.00
400 amp……………………………………………………………………. $15.00
600 amp…………………………………………………………………. $20.00
Over 600 to 2,000 amp………………………………....
$25.00
Over 2,000 amp…………………………………………………………
$50.00
Circuits, each (new or replaced) ................................................................................ $ 5.00
Horsepower (machinery):
First hp……………………………………………………………………. $ 7.00
Each additional hp……………………………............................................ $ 0.25
Back-up generator:
a.
10 Kw or less .............................................................................
$60.00
b.
Over 10 Kw ................................................................................
$70.00
Pool wiring and/or bonding .......................................................................
$60.00
Repair, extension, and/or maintenance of wiring……………………...
$60.00
Reset, Relocation, and Reconnect, each………………….…………...
$60.00
Reinspection fee, each……………………………………
$60.00
Additional final inspection, each………………………...……
$60.00
Solar Array ……………… $60.00 plus percentage of the construction cost as established by
the Departments fee schedule.
Electrical Vehicle Device …………………………………………………… $60.00
If the exact number of circuits or horsepower is unknown at the time of application for a permit, a
permit may be taken for the minimum amount known with new permits issued as the intent of the
work known.
PLUMBING PERMITS
For plumbing permits issued and obtained prior to commencement of the work for which such
permit is required, the following fees shall be levied, with a minimum permit fee being $60.00.
Each plumbing fixture or trap or set of fixtures on one trap, including water and
drainage piping therefor……………………………………...
$ 6.00
Backflow Protection, each…………………………………………………………. $ 6.00
Building Sewer, each:
Under 100'……………………………………………...
$12.00
100' or over………………………………………………………………… $25.00
Building Water, each:
Under 100'……………………………………………………………...
$12.00
100' or over………………………………………………………………… $25.00
Water softener, each…………………………………………………………….
$ 7.00
Trailer Park Sewer, each…………………………………………………………. $10.00
Drain within building for rainwater systems, each……………….
$ 6.00
Water heater and/or vent, each………………………………………………...
$ 7.00
Gas Reconnection, each…………………………………………………………. $60.00
Each gas piping system, per outlet………………………………………...
$ 3.00
Industrial waste pretreatment interception, including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps, each……………… $ 8.00
Installation, alteration or repair of water piping and/or water treating equipment. $ 6.00
Repair or alteration of drainage or vent piping………………………………… $ 6.00
Drywells, each……………………………………………………………………… $12.00
Lawn sprinkler system on any one meter, including backflow protection devices
thereof, each……………………………………………………………………. $ 6.00
Fire protection sprinkler system:
Up to 30 heads…………………………………………………………… $60.00
Plus each additional 10 heads thereafter………………………………… $ 8.00
Gas tanks and pumps……………………………………………….
$12.00
Back-up generator -gas line:
a.
10 Kw or less………………………………………………….
$60.00
b.
Over 10 Kw…………………………………………………
$70.00
Reinspection………………………………………………………………………… $60.00
Additional final inspection, each…………………………………………………… $75.00
HEATING AND AIR CONDITIONING PERMITS
For heating and air conditioning permits issued and obtained prior to commencement of that
work for which such permit is required, the following fees shall be levied for the installation,
with a minimum permit fee being $60.00. When the total capacity of any system in any
single installation is provided by more than one (l) unit, the sum of the capacities of each unit
and the total number of such units shall determine the fee.
Heating Units:
Space heaters, each, 30,000 BTU input or more…………………………………… $ 60.00
Warm-air furnaces, unit heaters, cabinet heaters, radiant tube heaters…………… $ 60.00
Oil and gas conversions……………………………………………………………. $ 60.00
Electric furnaces (air handling) ……………………………………………………. $ 60.00
Air Conditioning:
Central, electric:
Less than 10 tons…………………………………………….
$ 60.00
Over 10 tons………………………………………………………. $ 70.00
Water Chillers……………………………………………………………… $ 85.00
EMI air blowers………………………………………………………….. $ 60.00
Ventilating and exhaust systems, unit ventilators:
Less than 500 CFM capacity……………………………………
$ 6.00
500 to 1,500 CFM capacity………………………………..
$ 12.00
Greater than 1500 CFM capacity…………………………. $ 20.00
Ventilating Commercial Hoods:
Each………………….……………………………………………….
$120.00
Refrigeration and Engine-drive, gas-fired, or oil-fired cooling equipment:
Up to 10 horsepower, each……………………………………………… $ 60.00
More than 10 horsepower, each…………………………………………….. $ 75.00
Rooftop combination furnace and air conditioning units:
Up to 7 ½ tons………………………………………………….
$ 60.00
7 ½ tons or more………………………………………………..
$ 75.00
Heat pumps:
Up to 7 ½ tons, each……………………………………………… $ 75.00
7 ½ tons or more, each…………………………………………….. $ 85.00
Earth coupled water source……………………………………....... $ 60.00
Mini-split Unit………………………………………………………………………. $ 60.00
Each Head………………………………………………………… $ 20.00
Boilers, steam or hot water:
Up to 300,000 BTU…………………………………………………
$ 60.00
300,000 BTU or more……………………………………………………… $ 70.00
Combination air conditioning/heating,
VAV boxes With or W/O coil…………………………………………... $60.00
P-Tac, Per Unit…………………………………………………………… $60.00
Air handlers ……….
……………………………………………………….......
$70.00
Duct and register:
Up to 30 openings, per system……………………………………………… $60.00
31-100 openings, per system……………………………………………… $80.00
Over 100 openings, per system…………………………………………….. $100.00
Back-up generators -gas line:
………………………………………………………. $60.00
Gas Reconnection, each……………………………………………………………… $60.00
Gas Piping (distribution of piping to equipment) to be included on permit application
Each gas piping system, per outlet…………………………………………………. $ 3.00
Wood burning stoves, per flue (including chimney and chimney connector)…… $60.00
Each reinspection fee…………………………………………………………….. $60.00
Each additional final inspection………………………………………………….. $70.00
MISCELLANEOUS PERMIT FEES
Moving Permits:
Any one or two story building over public streets or alleys……………….. $125.00
Any building greater than two stories in height over public streets or alleys $175.00
Wrecking and Demolition Permits:
Residential:
$.02 per square foot, with a minimum fee of $60.00
Commercial:
$.015 per square foot, with a minimum fee of $60.00
Sign Permits:
Under one (1) square foot or less…………………………………… no fee
1 to 25 square feet………………………………………………….. $ 40.00
26 to 50 square feet………………………………………………… $ 60.00
51 to 100 square feet……………………………………………….. $ 85.00
Over 100 square feet……………………………………………….. $120.00
Temporary Signs:
Initial Permit……………………………………………………… $ 40.00
Each Extension…………………………………………………… $ 45.00
Tent and Temporary Structures:
a.
First Term…………………………………………………….
$60.00
b.
Renewal………………………………………………………….
$65.00
Document Processing/Preparation Fees:
a.
Verification
Documents…
...................................................................................
$70.00
LICENSING AND REGISTRATIONS
GENERAL CONTRACTORS:
Pre-Licensing registrations:
a.
Registration form completed and notarized
b.
$5,000 bond for one year only made out to the
City of South Bend and St. Joseph County and
must state "Building Contractor"
c.
$125.00 registration fee
INCLUDES: General contractors, homebuilders, general remodelers,
concrete contractors, framing contractors, siding contractors, roofing
contractors, drywall contractors, masons, trim contractors, steel erectors, fire
protection sprinkler contractors, fencing contractors, swimming pool
contractors, commercial hood installers, lawn sprinkler contractors, water
softener contractors, low voltage contractors. ·
DEMOLITION CONTRACTORS:
Registration:
a. $10,000 bond for one year only made out to the
City of South Bend and St. Joseph County
b. $125.00 registration fee.
City of South Bend Only: Property owner(s) doing own demolition
work on buildings or structures over 600 sq. ft. - $10,000
bond is required to be posted.
ELECTRICAL:
Class A - Electrical Contractor's License
a. $5,000 bond for one year only made out to the
City of South Bend and St. Joseph County
b. Fees: 1. New - $125.00
2. Renewal - $125.00
Examination Filing Fee - $50.00
Class B Industrial Electrical License
a. $125.00 fee
b. One year term from date of issuance
HEATING AND AIR CONDITIONING:
a. $5,000 bond for one year only made out to the City of South
Bend and St. Joseph County
b. Fees: 1. New - $125.00
2. Renewal - $125.00
Examination Filing Fee - $50.00
PLUMBING:
Plumbing contractors, excavators, and sewer cleaner registration:
a. $125.00 fee
b. Plumbing Contractors:
One year in accordance with State license
c. Others: One year from date of issuance
SIGN CONTRACTORS:
Registration:
a.
Registration form completed and notarized
b.
$5,000.00 bond for one year only made out to the City of South Bend
and St. Joseph County
c.
Certificate of Insurance
d.
$125.00 registration fee
M INIMUM REQUIRED INSPECTIONS
For onsite construction, from time to time the Building Official, upon notification from the permit
holder or his agent shall make or cause any necessary inspections to be made and shall either approve
that
portion of the construction as completed or shall notify the permit holder or his agent wherein
the same fails to comply with the Code.
A.
FOUNDATION AND FRAMING:
1.
Foundation Inspections:
Will be made after footing areas are excavated and formed; and any requiring reinforcing steel
is in place and prior to the placing of concrete. The permit holder or his agent shall notify
the Building Officials by phone or in person not less than 24 hours prior to placing of
concrete. In the event the inspection has not been made and said 24 hours has elapsed, the
placement of concrete may proceed.
2.
Frame and Masonry Inspections:
Will be made after the roof, masonry, all framing, fire stopping, and bracing are in place.
B.
PLUMBING, MECHANICAL, AND ELECTRICAL:
1.
Rough Inspections: Must be made prior to covering or concealment
and before fixtures are set.
C.
OTHER INSPECTIONS:
In addition to the called inspections above, the Building Department may make or require any
other inspections to ascertain compliance with the Code and other laws enforced by the Building
Department. ·
D.
FINAL INSPECTIONS:
1.
Final Inspections:
Final inspections are tobe made after the building is completed and before building iso ccupied.
Work shall not be done on any part of the building or structure beyond the point indicated
in each successive inspection without first obtaining the written approval of the Building Official. Such
written approval shall be given only after an inspection shall have been made of each successive step
in the
construction as indicated by each of the inspections required above.
SCHEDULING OF INSPECTIONS: TELEPHONE NO. (574) 235-9554
The inspectors are in the office Monday thru Friday between 7:30 a.m. and 9:00 a.m. and
between 3:30 p.m. and 4:00 p.m. Inspections requested between 7:30 am. and 9:00 a.m. generally can be
made the same day. All inspections requested AFTER 9:00a.m. will not be made until the next
working day.
OFFICE HOURS:
Monday thru Friday: 7:30 a.m. to 4:30 p.m.
RESIDENTIAL PERMIT APPLICATION CHECKLIST
REMODELING:
(including roofing, siding, and windows)
1.
Owner's name, address, and telephone number
2.
Address of property work being done, if different from owner's
3.
Contractor performing work
4.
Cost of work when completed
5.
Electrician, plumber, and HVAC contractors involved, where applicable
ADDITIONS:
(including unattached garages and sheds)
1.
Owner's name, address, and telephone number
2.
Address of property work being performed, if different than owner's
3.
Site plan showing size of property, size and location of all structures on
property, and size and location of addition being planned.
If
parcel is
under 3 acres, it must be drawn to scale.
4.
Contractor performing work
5.
Cost of work when completed (total project including any mechanicals)
6.
Electrician, plumber, and HVAC contractors involved, where applicable
7.
Energy Code Certification
8.
Location of septic system on property
NEW CONSTRUCTION -DWELLINGS:
1.
Septic and well permits from the St. Joseph County Health Department or
sewer and/or water permit from the South Bend Engineering Department
2.
Driveway permit from the St. Joseph County Engineering Department, if County
3.
Legal lot of record in accordance to the St. Joseph County Zoning and
Subdivision Ordinances, and should be checked with the Building Department
prior to obtaining ownership of the property. ·
4.
Site plan showing size of property and size and location of dwelling on the
property.
If
parcel is under
3
acres, it must be drawn to scale
5.
Owner's name, address, and telephone number.
6.
Value of house when completed
7.
Size of dwelling including dimensions of basement, second floor, garage(s),
porches, and decks over
30"
above grade.
8.
All contractors involved in the project-building, electrical, plumbing, and
HVAC.
9.
Energy Code Certification
CITY ONLY:
If the new dwelling is being located in the Northeast Neighborhood Development Overlay
District, i t must go through plan review and will have an additional charge.
NOTE:
All contractors, including sub-contractors, must be registered or licensed with our
Department in order to perform work in St. Joseph County and the City of South
Bend; with the exception that an owner-occupant of the residential dwelling may
perform their own work.