ANNUAL REPORT 22/23 14
GOAL SEVEN
100% of the CNP sta will be trained
annually to maintain compliance.
MPS works to ensure all CNP sta members are fully
trained and maintain state and federal compliances.
20% of all equipment identified during
the district-wide equipment audit will
be replaced over the next five years.
MPS has replaced all CNP equipment identified in a
2019 internal audit, and replaced all of the worn carpet
at all locations identified in a 2019 Logistics audit. CNP
equipment replacement is now on an as-needed basis.
CNP is working on replacing 12 schools’ cafeteria
furniture, and will begin setting up the replacement of
12 additional schools’ cafeteria furniture in the summer
of 2023.
Decrease the wait time between
receiving and distributing commonly
used items by 10% annually.
MPS has implemented an internal system that allows
school administration or school liaisons to request
needed materials. Once the request is submitted and
reviewed by Logistics, MPS will fulfill the requested
order within 24-48 hours.
Annually submit plans for upgrading
and renovating MPS facilities.
Currently, Volkert is completing a district-wide Capital
Improvement Plan to include all renovations and/
or replacements for the district. Two parking lots
were paved in the fall of 2022, and one parking lot is
scheduled for replacement in December of 2022. The
BTW High School project is nearing completion with
occupation scheduled for 2023. The central oce
renovation is underway and scheduled for completion
in May of 2023. This project will consolidate five
buildings located throughout the city into one location.
This will reduce the maintenance and operation costs
while providing a more productive environment with
essential central oce sta in one location.
Decrease by 2% the number of MPS
facilities that need HVAC and roof
replacements.
Between 2019 and 2021, MPS completed eight roofing
projects and two complete school HVAC replacements.
Since then, MPS has completed an additional five
roofs, a third HVAC project is underway, and a fourth
will begin in February of 2023. An additional five roof
replacement projects await board approval and two
additional schools’ HVAC renovations are under design
with the MPS mechanical engineer. Equipment for
these projects has been ordered and the contracted
services will be bid out to plan for beginning the
installation in the summer of 2023.
100% of schools will have a safety
plan and an assessment on needed
improvements.
The ALSDE audit was recently completed and all
schools have an updated safety play with noted
improvements.
Annually, certify 25% of the
transportation sta on new training.
Transportation sta are participating in annual
professional development/training to maintain
necessary certification.
MEASURABLES
Did you know?
Montgomery Preparatory Academy for Career
Technologies (MPACT) is the career technical
education hub in Montgomery. It offers adver-
tising design, building construction, electrical,
emergency and re management services,
health science, HVAC, industrial maintenance,
information technology, Jobs for Alabama
Graduates (JAG), law enforcement, welding and
modern manufacturing.